Slope Converter

Enter any one value — all others update instantly.

FormatInput / Result
Percentage (%) %
Ratio (1 in X) 1 in
Degrees (°) °
Rise / Run Rise / Run
Radians —
Convention: In QLD civil engineering, slopes are typically written as 1 in X (e.g. 1 in 50 = 2%). Roads and drainage use %. Degrees are common in geotechnical work.

Why slope gets written three different ways on the same job

Slope is one of the few quantities in Australian civil engineering that is routinely expressed three different ways on the same set of drawings — as a ratio (1 in X), as a percentage (%), and as an angle in degrees (°) — and drafters are expected to move between them without thinking. A longitudinal road grade might be called up as 6%, the crossfall on the same carriageway as 1 in 40 (2.5%), a table drain batter as 1 in 6, and a cut batter in the geotechnical report as 34°. They all describe the same underlying idea — vertical rise divided by horizontal run — but the convention shifts by discipline. This converter exists so you can move between all four representations (ratio, percent, degrees, and rise/run) instantly while you are reading or checking a drawing, without opening a spreadsheet.

What "1 in X", "%", and degrees actually mean

The three formats are just different ways of writing rise over run:

A common trap: percentage grade is not the same as the angle in degrees. A 100% grade is 45°, not 90° — because 100% means rise equals run (1 in 1). People who assume "100% = vertical" get slopes badly wrong. For the shallow grades civil work usually deals with (under about 10%), the percentage and the degree value happen to be numerically close, which lulls people into treating them as interchangeable — they are not, and the gap widens fast as slopes steepen.

Which convention is used where (Australian practice)

ApplicationConvention normally usedTypical values
Road longitudinal gradePercentage (%)0.5%–8%+
Road / pavement crossfallPercentage or 1 in X2.5% (1 in 40), 3%
Stormwater & sewer pipe grade1 in X1 in 100, 1 in 200 (typical)
Table drains & swales1 in X1 in 4 to 1 in 6 batters
Earthworks batters (cut/fill)1 in X or degrees1 in 2, 1 in 3
Geotechnical (slope stability)Degrees (°)angle of repose etc.
Accessible ramps (AS 1428.1)1 in X1 in 14 max ramp gradient

Handy conversion table

RatioPercentDegrees (approx)
1 in 425%14.04°
1 in 812.5%7.13°
1 in 1010%5.71°
1 in 147.14%4.09°
1 in 205%2.86°
1 in 402.5%1.43°
1 in 502%1.15°
1 in 1001%0.57°
1 in 2000.5%0.29°

Worked examples

  1. Reading a road grade. A design plan shows a 6% longitudinal grade over a 150 m chainage. That is 1 in 16.7, and it will fall 9.0 m over that length (150 × 0.06). If a reviewer asks "what's that in degrees?", it is about 3.43°.
  2. Checking a pipe against a drainage table. A stormwater line is drawn at 1 in 150. Your drainage standard quotes minimum grades as a percentage — 1 in 150 is 0.667%, so you can compare it directly against the tabulated minimum.
  3. Batter callout. A cut batter noted as 1 in 3 is 33.3%, or about 18.4°. If the geotech report gives a maximum stable angle in degrees, converting the drawn batter to degrees lets you check it in a single step.

Common mistakes

Related standards and references

Slope conventions appear throughout Australian civil documents: Austroads Guide to Road Design (grades and crossfalls as %), the Queensland Urban Drainage Manual (QUDM) and council standard drawings (pipe grades as 1 in X), and AS 1428.1 for accessible ramp gradients. Angle-of-repose and batter stability values in degrees come from the project geotechnical report. This tool is a units converter only — always design to the figure and convention called up by the relevant standard and the local council.